|
Central Alberta PFRA Glockemann 320 Oasis Pump Test Site |
|
Spring fed dam is water source. Excess head pressure required an uphill diversion of water to a header barrel to allow the correct 1.6m drop to pump level |
9m drive tube connects to pump. Flow of water through the tube provides the energy to produce the 24 hour pumping action of the Glockemann. |
![]() |
![]() |
| Delivery of 7 litres a minute of water to the trough located 12 meters above and 500 metres away from the pump site. | 3 - 150 m coils of 50 mm pipe were laid out to pasture water tank. |